
The builder called me towards the end of our first week with the bad news that the front wall of the house needed rebuilding from the 1st floor up. The original survey hadn't detected the problem despite the fact that the wall was sagging over 3 inches out from its original position. We may possibly have a case for suing the surveyor, which would at least enable us to recoup the costs of remedial work. But this has also put us back at least 2 weeks. : ((
No comments:
Post a Comment